Tufts University Football Locker Room

CM&B completed a fast-track, 6,100-SF “summer slammer” renovation of Tufts University’s football locker room, delivering a modern, functional space in time for the start of the season. The project involved a full renovation, including demolition of existing lockers, flooring, curbs, and furnishings, as well as redesigning and combining multiple spaces to support team and position-group meetings. CM&B collaborated closely with the University and coordinated multiple owner vendors to deliver the project on time, on budget, and with minimal disruption.

Sector

Academic

Location

Medford, MA

Project Size

6,100-SF

Client

Tufts University

Industry Partners

Santec

Years Completed

2022

24-web-or-mls-DSC00128
In just a few months, CM&B delivered a complete locker room overhaul, proving that even tight timelines can produce high-performance spaces.

Construction Complexities

Fast-track 6,100-SF renovation completed in a single summer to be ready for football season.

Gut renovation including removal of existing lockers, rubber flooring, curbs, and furnishings.

Combined multiple demised spaces, cutting new openings to create cohesive and flexible team and position-group meeting areas.

Design-build MEP systems installed alongside new finishes for a fully modernized locker room.

Managed project budget and coordinated with University vendors to streamline construction.

Pre-construction planning optimized phasing and logistics to ensure on-time delivery.

An Inside Look

Explore more projects

Ready to start your next project?
Let’s build something great together