Boston Freightliner

CM&B is proud to announce the opening of the new Boston Freightliner facility in Everett, MA. As part of the Encore Boston Harbor project, the facility was relocated from Bow Street to Air Force Road. The project included constructing a 28,800SF, two-story building with a parking lot for 10 semi-trucks and 40 vehicles.

Project Highlights:

  • Urban site with soil management plan
  • New utilities – electric, gas water, sewer, drainage and roadway/site lighting
  • Precast concrete piles/structural slab foundation system
  • Pre-engineered metal building shell with mezzanine
  • Complete fit-up for truck service facility

Related Posts

Uncategorized

CM&B Completes Avon Village Center in Avon, CT

Uncategorized

Whole Foods Market – Refrigerated Distribution Center

Uncategorized

MedTech Mondays

Uncategorized

From the College Classroom to the Construction Site

Uncategorized

America’s Favorite Cult Grocer – Wegmans Food Markets

Uncategorized

Village Automotive Group – Boston Volvo – Boston, MA

Ready to start your next project?
Let’s build something great together