CM&B partnered with Village Volvo on the renovation of an existing 1924 building that was the original home of International Harvester Farm Equipment.
Scope of Work:
- Complete demolition of the ground level connector building between 61 N Beacon Street and 65 N Beacon Street
- Renovation of all 5 floors, including hazardous materials abatement of all floors and roof
- Amenities include a basement level drive-in service center, two-story showroom, lounge area, cafe and offices
- Top two levels are ready for future tenant space
- New utility services brought in from the street, new site drainage systems and retaining wall as well as a new freight and passenger elevators
- Removal of old passenger elevator exterior hoist way
- Project received the 2020 Tsongas Award from Preservation Massachusetts and the 2019 Preservation Achievement Award from Boston Preservation Alliance
CM&B featured Village Volvo in a blog post on preserving and protecting historic architectural buildings of the past has been never been more important that the present. To read more check out Preservation of the past will lay the foundation for a successful future
Meet the Project Team
CM&B, Inc.
Sean Fahy, Neil Slyva, Marty Flannery, Katelyn Steen, Pat Hasselschwert
Architect
Arrowstreet, Inc
Civil
Vanasse Hangen Brustlin Inc.
Structural
Goldstein-Milano LLC.