Whole Foods Market
Sudbury, MA-A 45,000-SF fit-up and new facade in an existing retail shell building opened in July. Located at the former home of Raytheon, Whole Foods will be the first tenant to be located at what is one of the largest development projects in Sudbury's history.

Chrystie Place, NY-40,000 sf Renovation of an existing Whole Foods Market

Brooklyn, NY-Ground-up construction of new 67,000 sf store including site construction

Bryant Park, NY-Interior fit-up for a new 43,000 sf Whole Foods Market occupying two levels of the MetLife Building at the intersection of 42nd street and 6th Ave. The store will feature a restaurant and bar overlooking Bryant Park and the New York City Public Library.

Hyannis, MA-Construction of a new 26,616 sf store in a former Border's Books building shell

Boston, MA (Ink Block)-Conversion of space within an existing multi-level, multi-use building to a new 50,000 sf Whole Foods Market

New York, NY-Renovation of a two-story building for a new 43,418 sf Whole Foods Market including new storefront, mechanical systems and basement offices

Williamsburg, Brooklyn, NY-Interior construction of a multi-level building for a new Whole Foods Market. Project includes fit-up of new mechanical systems, elevators, escalators, PFlow Chart Conveyor, specialty food service areas and high-level finishes. Structural slab penetrations require extensive coordination for location, supplementary slab reinforcing and waterproofing. Store design features include a neighborhood public with dining area and a lower level parking garage.

Nashua, NH-Conversion of a former Market Basket supermarket to a new 37,765 sf Whole Foods Market including new underslab utilities and slab upgrade

Closter, NJ-Fit-up of a former K-mart store for new 41,000-SF Whole Foods Market

Clark, NJ-Fit-up of a 41,000 sf Whole Foods Market

Distribution Center Cheshire, CT-Construction of 3 new 35+ ft tall coolers totaling over 40,000 sf in currently ambient temperature space, related structural upgrades to the existing structure and installation of a Quell Fire Protection System

Westford, MA-Reconstruction of an old supermarket to a new Whole Foods Market. Scope of work included complete interior demolition, removal of 50% of existing floor slab, complete overhaul of existing building systems including new electrical service, all new refrigeration and 90% replacement of HVAC systems, all new interior finishes and new electrical service

Bedford, NH-Interior fit-up of a new 45,000 sf Whole Foods Market anchoring the new Goffe Mill Plaza in Bedford NH. Store design features include a built-in bar, chilled drink rail, adjacent glass keg cooler, 12 to 16 full taps featuring locally brewed craft beer, internal wood fired grille, exterior patio overlooking two waterfalls, and the use throughout the interior décor and building elements of various wood materials reclaimed from the original Wayfarer Inn building

Le District French Market
New York, NY

Construction of a new 30,065 sf food market/restaurant, bar and lounge concept with supporting full-service commercial kitchen,office and storage areas.

Zo Greek

Zo Greek
Somerville, MA

Custom 2,600 sf restaurant build out for Zo Greek. Zo had built their reputation through their food trucks, this is their first full service restaurant. Project included custom plaster walls, gas fireplace, an extensive custom mill work package and hand painted murals.

Martina
East Village, NY

Fit-up of a new 2,250 sf restaurant for Nick Anderer Executive Chef for Marta and Mialino. Martina is a spin-off of Marta a larger Roman themed restaurant specializing in wood fired pizza. This restaurant features handmade floor tile imported from Europe, a custom wood storefront and tile walls creating an atmosphere reminiscent of a Pizzeria in Rome.

Sabroso Taqueria
Somerville, MA

1,500 sf new fit-up of a Mexican restaurant concept that was built at the Assembly Row Development. This is the first physical location for Sabroso Restaurant, the current Sabroso is a food truck that has been very successful in Boston. The project included hand painted wall graphics to highlight the histories of this concept.

Whole Foods Market
Sudbury, MA

New fit-up of a Whole Foods Market in an existing 45,000 sf retail shell building.

Boston Scientific
Marlborough, MA

Office fit-up was an occupied renovation that required Boston Scientific to operate in the second half of the space while cm&b built out the 26,000 sf section. The office space is a new prototype work space for Boston Scientific. It is being set up as a collaborative work environment designed to build collaboration and teamwork. A fast track project for the team it was designed in 3 weeks and space was built in 8.

Tarbox Hyundai

Tarbox Hyundai
North Kingstown, RI

This is the second Hyundai building in this region to be built with the new manufacturers design standards. A 26,115 sf, ground up project which includes14 service bays, 3 wash & reconditioning bays and a drive-thru service reception. This will be cm&b's first project with Tarbox.

Whole Foods Market HQ Offices
Marlborough, MA

New 50,000 sf office space for the Whole Foods North Atlantic Region. 14,000 sf first floor with reception, test kitchen and conference room. 36,000 sf on the second floor for offices and additional conference rooms.

Shake Shack
Penn Station, NY

A 4,000 sf fit-up of Shake Shack Penn Station opened in 2017, in the main concourse of the station that serves over 600,000 commuters a day. It is also just steps away from Madison Square Garden and Macy's Flagship Store on 34th street.

Closter Plaza
Closter, NJ

Building construction, demolition and renovations of multiple buildings in an occupied/phased format at the existing 150,000 sf retail center, originally constructed in the 1960s. Renovations and upgrades will be made to the retail center facades, pedestrian ways, mechanical infrastructure and the entire site parcel to accommodate a new mix of retailers and rebranding of the center. Scope of work includes the demolition of existing structures and the construction of a new, 50,000 sf Whole Foods Market Shell. The project is expected to take fourteen months to complete.

Fathers & Sons Audi/VW
West Springfield, MA

Demolition of five existing buildings to make way for the construction of a new ground-up 52,000 sf dual-branded Audi and Volkswagen Dealership. The new building will conform to the latest manufacturer's brand standards for both Audi and Volkswagen. Each dealership brand will have their own sales and services areas with some shared mezzanine and storage spaces. Scope of work includes a Geopier foundation support system.

Bedford Market Place
Bedford, MA

Complete shopping center re-construction in phases around ongoing business operations. Scope of work includes parking area re-construction, new site lighting, new facade construction at existing anchor tenants, new building construction and demolition/re-construction of two existing retail strips.

Shake Shake
Fulton Center, NY

5,000 sf tenant fit-up of a new Shake Shack restaurant prominently located on the second floor of the premier retail complex and transit center, where more than 300,000 passengers pass through the daily. The unique space is a half oval with glass curtain walls on both sides looking out to the World Trade Center and required a rigorous permitting and inspection process working with the MTA Authority.

Liquor Depot
Norwalk, CT

Renovation of a former Barnes &Noble retail store to a new high-end liquor store. This will be the first location for the Canadian Chain in New England. cm&b provided extensive pre-construction services managing all design disciplines and providing cost input throughout the design process. The store is currently on schedule to open this July.

Shake Shack
Herald Square, New York, NY

4,580-SF tenant fit out on two levels for a new Shake Shack restaurant in Manhattan's iconic Herald Square. Scope of work included substantial exterior work and vertical transportation. Herald Square will be the Chain's ninth location in Manhattan.

AutoFair Nissan
Chelmsford, MA

Renovation of an existing 32,000 sf retail building to create a new Nissan dealership to conform with current Nissan branding standards. The dealership features a 4,500 sf showroom and 16-lift service bays with alignment bay and 2 wash/detail bays. The main lot will provide 111 parking space plus an expanded inventory lot for another 90 spaces. The scope of work includes site improvements. This will be cm&b's first project with AutoFair. The Group's President, Andy Crews, received TIME Magazine's 2015 Dealer of the Year Award.

Audi of Warwick
Warwick, RI

31,000 sf occupied renovation of an existing Audi dealership to conform to the new Audi Terminal Image Program. The scope of work includes the conversion of a vacant Volvo space adjacent to the dealership into a Certified, Pre-Owned Audi showroom. A new exterior ACM panel system, an energy efficient LED lighting package, specialty suspended ceilings, and updated tile flooring are among some of the upgrades that will be part of the phased reconstruction.

Best Chrysler Dodge Jeep Ram
Plymouth, MA

New ground-up 26,000 sf Chrysler Dodge Jeep Ram dealership located on an acre site at Colony Place in Plymouth, MA. The is new building will conform to the latest manufacturer design standards and will include a drive-thru car wash, 11 new service bays, and an open air service drive canopy.

Historic Coignet Landmark Building

Historic Coignet Landmark Building
Brooklyn, NY

Exterior renovations to an existing 2.5-story historic Landmark building constructed in 1872 to restore its original Italianate details. Scope of work includes select demolition and repairs/replacement of cast stone, stucco, brick, concrete foundation, stairs, doors, curbs and fence

Ethan Allen

Ethan Allen
Hyannis, MA

Ground-up construction of a new 8,000 sf building shell for a new Ethan Allen store, including all associated sitework, site lighting and landscaping

Porsche of Norwell
Norwell, MA

Interior and exterior renovations of an existing Volvo dealership and the new construction of a 2,000 sf showroom and service reception addition for a new Porsche dealership.

Nordstrom Rack

Braintree, MA-Renovation of a former K Mart store in an active open retail plaza for a new Nordstrom Rack store

Vienna, VA-Renovation of an existing 2 floor retail space to a new multi-level store

Warwick, RI-Interior fit-up of new 35,000 sf store

Boston, MA-Interior fit-up of 30,000 sf store in the former Filene's Basement space

Portland, ME-Interior fit-up of 29,600 sf store in Maine Crossing Shopping Center

Sterling, VA-Occupied renovation of an existing 40,630 store

Westwood, MA (University Station)- Complete build-out of new 34,800 sf store in the main retail center of a new 130 acre multi-use development

Xaverian Brothers High School
Westwood, MA

Construction of a new 12,300 sf academic wing including state-of-the-art science laboratories and five classrooms for the science and engineering programs

Audi of Norwell
Norwell, MA

Complex, two-phased project including demolition, sitework, renovation and new construction resulting in a new 32,500 sf dealership. Phase one included the demolition of existing wash and service bays, and the construction of a new 15-bay service department. Phase two included the demolition of the existing showroom followed by the construction of a new Audi Terminal Image showroom and associated offices.

Dave & Buster's

Manchester, CT-Ground-up construction of a new 20,000 sf Dave & Buster's
Pelham Manor, NY-Fit-up of 20,000 sf interior space above a Fairway Market for a new Dave & Buster's
Woburn, MA-Ground-up construction of a new 42,816 sf restaurant complete with lower level parking garage

Shake Shack

Barnard College New York, NY-New 4,000 sf Shake Shack fit-up in an existing restaurant space on the Barnard College Campus in NY.

Livingston, NJ-2,000 sf tenant fit-up in an existing building for a new Shake Shack restaurant. It will also be the 9th Shake Shack that cm&b has built.

National Harbor, MD-3,000 sf fit-up of a new Shake Shack restaurant located within the new MGM Casino Resort at National Harbor

Paramus, NJ-4,000 sf fit-up of a new Shake Shack restaurant

Penn Station-New York, NY-4,000 sf tenant fit-up on the main concourse of the station

Newbury Street-Boston, MA-Fit-up of a new 6,670 sf Shake Shack restaurant

Seaport-Boston, MA-3,000 sf fit-up for a new Shake Shack

Bridgewater, NJ-Fit-up of a 3,850 sf Shake Shack restaurant in an existing mall

BMW of Cape Cod
Hyannis, MA

Ground-up construction of a new 26,650 sf dealership. Scope included site development

Toyota of Falmouth

Toyota of Falmouth
Bourne, MA

Phased interior and exterior renovation of an existing Toyota dealership and the new construction of a 9,950 sf service reception and service shop addition

Restaurant Depots

Restaurant Depots

Cranston, RI - Phased interior renovation of an occupied store and a 24,000 sf addition for a new 121,000 sf Restaurant Depot including new receiving area, interior office space and refrigeration modifications. Site-work to include parking lot modifications and new loading dock area.

Newburgh, NY - Ground-up construction of a new 62,000 sf Restaurant Depot store and related site development. This marks cm&b's third project for the national wholesale food service supplier.

Catholic Charities Child Care Center
Lynn, MA

Renovation of an existing 16,000 sf child care center

JRM GreenWorks
Peabody, MA

Ground-up construction of a 55,000 sf state-of-the-art recycling process center including site improvement of the 4 acre site

Lexus of Watertown Pre-owned
Watertown, MA

Renovation of a two-story building to create a 15,000 sf pre-owned showroom and second floor vehicle storage space requiring ramp construction. Scope included the renovation of a second building to a tandem car wash and significant site improvements

Bernardi Toyota
Framingham, MA

Interior renovation of showroom, customer waiting and service reception areas, and second floor offices in an existing dealership. Scope also included a 7,000 sf addition to the dealership's service area

Roxbury Latin School
West Roxbury, MA

Three phase project consisting of a new Science, Technology, Engineering, Art and Math fabrication lab and workshop, choral room and student center renovations

Ursuline Academy
Dedham, MA

Renovation of a 70 year old, two-story masonry carriage house for new use as classroom space. Project required complete renovation of the existing building and a small addition to the front of the building. Short duration to accommodate start of academic year

BFX Studio

Back Bay - Boston, MA-Fit-up of basement and first floor space for a new 9,700 sf high-end fitness club

Ira Toyota of Manchester
Manchester, NH

Renovation of an existing 40,000 sf dealership

Boston Sports Club
Wayland, MA

Interior fit-up of new 15,000 sf Boston Sports Club

Danvers Ford

Danvers Ford
Danvers, MA

Renovation of an existing 30,000 sf dealership to conform to Ford's new image program

Herb Chambers Ford
Westborough, MA

Renovation of an existing dealership and the construction of a 3,000 sf addition

Bassett Furniture

Burlington, MA- Interior fit-out of new 11,400 sf store
Chestnut Hill, MA- Interior and exterior renovation of a multi-level former Barnes & Noble store for a new 19,834 sf store

Berkshire Bank
Westborough, MA

Renovation of an existing 6,000 sf building and the construction of a 3,500 sf addition for a new bank branch

Sharon Memorial Park
Sharon, MA

Demolition of an existing 6,000 sf two-story administrative building and the construction of a new 7,000 sf wood-framed visitors center including all associated site work

Herb Chambers Chevrolet
Danvers, MA

Renovation of an existing 39,000 sf Chevrolet dealership

Turner's Seafood Grill
Salem, MA

Interior renovation and conversion of an existing 4,000 sf restaurant

Renovation of existing second floor banquet areas, kitchen and bar

Bernardi Audi
Natick, MA

Demolition of an existing building and the construction of a new 2-story, 64,000 sf dealership followed by the demolition of the existing Audi dealership upon completion of the new

Kelly VW
Danvers, MA

Construction of a new 27,800 sf dealership and renovation of a 25,000 sf certified pre-owned building

Herb Chambers Chrysler Dodge Jeep Ram
Danvers, MA

Renovation and 3,225 sf addition to an existing 22,000 sf dealership including new showroom space and facade

Chick-fil-A

Chicopee, MA- Ground-up construction of a new 3,000 sf restaurant
Enfield, CT-Ground-up construction of a new 4,500 sf restaurant

Digital Realty Trust

Needham, MA-Interior office fit out

Bedford, MA-Lobby renovation of an existing data center

Wakefield, MA- Modifications to 30,000 sf in an existing office building for conversion to a data center facility. Scope of work included a turn-key data center POD featuring approximately 6,000 sf of raised flooring and 1MW of IT load, along with new HVAC systems, a new 300 ft glass curtain wall façade and interior improvements to all public spaces.

Bright Horizons Family Solutions

Cummings Center Beverly, MA- Interior renovation of existing 10,000 sf childcare center.

Cambridge, MA- Select renovation of an existing 6,000 sf childcare center.

Somerville, MA-Renovation of an existing 7,000 sf office space to a new childcare facility

Boston, MA-Select interior renovation of an existing childcare center

Fairfield, CT-Construction of a new 10,000 sf childcare center

Chipotle Mexican Grill

Raynham, MA-Interior fit up of a new restaurant including major structural improvements
Cambridge, MA-Build-out of new 1,200 sf food court space at Cambridgeside Galleria
Hadley, MA-
Ground up construction of new 2,500 sf restaurant
Waltham, MA
-Interior fit-out of new 3,000 sf restaurant

Acura of Boston
Brighton, MA

Occupied renovation of existing dealership

Honda Cars of Boston
Everett, MA

Complete occupied renovation of an existing dealership. Construction of additions to Showroom and Service Reception areas to upgrade to Honda Image Generation 3. Dealership exterior including curtain wall was rebuilt to Honda Generation 3

Lundgren Honda

Auburn, MA Construction of new 52,000 sf dealership with service garage and carwash

Greenfield, MA Renovations of existing dealership to modify the service reception area and custom waiting area as well as building an addition for a new car delivery site. Development of adjacent parcel of land and demolition of existing building to expand the surface area parking

The Fresh Market

Bedford, NH-Interior fit-up of new 21,000 sf store
Bedminster, NJ- Fit-up of 17,000 sf store